Some updates on Atlantic Yards site work, mainly sidewalk work. The sidewalks outside the arena (first photo) and surface parking lot (third and fourth photos) are uniform; the challenge will be moving people on much more narrow sidewalks on the way from the lot to the arena.
The first, third, and fourth photos were sent by a community member; the second by Forest City Ratner.
Sidewalk work on Sixth Avenue; note the bollards just inside the fence
Work on the Carlton Avenue Bridge, which must open before the arena does (and should do so)
Work on Dean Street between Carlton and Vanderbilt Avenues
Work on the east side of Carlton Avenue between Dean and Pacific Streets
Comments
Post a Comment