Skip to main content

Posts

Showing posts with the label transit

Featured Post

Atlantic Yards/Pacific Park FAQ, timeline, and infographics (pinned post)

New plan to speed buses on Flatbush Avenue would dedicate bus lanes at center, add boarding islands. Might limit illegal idling/parking around Barclays Center.

A proposed Department of Transportation (DOT) and Metropolitan Transportation Authority (MTA) plan ( link ; also at bottom) for the northern part of Flatbush Avenue, from Livingston Street to Grand Army Plaza, proposes new center-running bus lanes, separated from regular traffic, to prioritize and speed bus service. So three current lanes would be come two, plus bus boarding islands. Six of 12 existing curbside bus stops would be consolidated into six bus boarding islands near subway stations. New pedestrian spaces would reduce crossing distances and improve visibility where Atlantic, Flatbush, and Fourth avenues meet. While the plan does not assess an impact on Barclays Center operations, the emphasis on moving Flatbush Avenue traffic presumably implies less tolerance for scofflaw activities illegal idling and double-parking, which are part of the scene around the arena., at least on Flatbush That said, such activities could instead be concentrated on other streets, and enforcement de...

An "extraordinary impact" on the built environment? Well, one escalator at the arena plaza is still out.

In my essay yesterday in CommonEdge,  In Honoring Philanthropists with the Onassis Medal, the MAS Forgets Its Crusade Against Supertalls , I criticized the Municipal Art Society for honoring Alibaba billionaire (and Brooklyn Nets/arena company owner) Joe Tsai and his wife Clara Wu Tsai, given that they bought apartments in the type of tower the MAS opposes. Another criticism regards the original purposes of the Jacqueline Kennedy Onassis Medal,  established  to “honor individuals and organizations that have made an extraordinary impact on the quality of New York’s built environment."  Today, it's also “awarded annually to individuals who, through vision, leadership, and philanthropy, have made an extraordinary contribution to New York City.” Tsai hasn't done much regarding the built environment, but, as I pointed out, the arena company, now owned by Tsai, has a  dismal record  of providing working  escalators  and elevators to the transit entrance...

"We belong here"? At arena plaza, with escalators out (how long? for renovation work?), the elevator's not quite a substitute.

July 22 In my 6/4/22 report conveying the Barclays Center press release regarding renovation work on the arena plaza, I skipped over one part without sufficient skepticism. "The construction will NOT take both the elevator and escalators out of service at the same time," the press release stated. The implication was that people who really need to get upstairs without climbing stairs will have an option.  That may be so, though do keep in mind that it's tough to get a stroller up the escalator when the elevator's out. But that glosses over the vastly different capacity between escalator and elevator; the former, of course, has far more capacity.  Outage persists July 26 When I exited the subway hub on Friday, July 22,  both escalators were down, as shown in the photo above, without any signage suggesting the elevator as an alternative.  Like everyone else I saw, I climbed the stairs. Note: there was no work going on at the plaza near the escalators, so it was unclear...

BrooklynSpeaks session tonight addresses transportation issues; stated focus on subway access, parking (permits), etc. Where's Site 5 loading?

Tonight's session, the second in BrooklynSpeaks' four-week Crossroads initiative  to generate a new plan for, and improvements related to, Atlantic Yards/Pacific Park, concerns Transportation. It's at 7 pm; the main presentation and slideshow should be posted soon after, with the opportunity to comment. (Last week concerned Urban Design , which I covered, focusing on proposals for Pacific Street and for Dean Street . The entire effort is keyed to an expected effort by the developer and state to move the bulk from the unbuilt "Miss Brooklyn" tower, once slated to loom over the arena, across Flatbush Avenue to Site 5, long home to Modell's and P.C. Richard, to enable a giant two-tower project.) Let's look at an October 2019 session, the only previous BrooklynSpeaks public meeting since 2014, which was something of a preview. From BrooklynSpeaks' summary,  After 16 years, it's time for a new plan : Include a transportation plan that works The transp...

At Quality of Life meeting tomorrow, big questions (platform, affordability) recur. Why mislead on after-hours work? Updates on elevator at Barclays Center transit hub, plaza renovations?

The next bimonthly Atlantic Yards/Pacific Park Quality of Life Meeting will be held tomorrow at 6 pm on Zoom . A typically anodyne agenda (right) lists presenters, including Empire State Development, Barclays Center, and Developer Greenland Forest City Partners, but offers no clues. Dial In: 646-558-8656 || Passcode: 985 1163 0645# Meeting ID: 985 1163 0645 During the meeting, attendees will be able to submit questions and comments to presenters via the virtual platform’s chat feature or via email to AtlanticYards@esd.ny.gov . What's at issue Previous  coverage here ; though Empire State Development is supposed to post  meeting notes here , they haven't done so yet. We're still waiting for updates on some of the big questions regarding the project, such as plans for the two-block platform over the Vanderbilt Yards, crucial to the construction of two sets of three towers. But we may finally learn about the configuration of affordable housing at the two towers nearing compl...

Barclays Center says escalators and elevator at transit entrance are working, but service seems limited by both security and maintenance issues

This is the sixth of several posts on the 6/9/20 Atlantic Yards/Pacific Park Quality of Life meeting, the first ever virtual meeting, held on Zoom. The first concerned non-transparency. The second concerned the timing for new construction. The third concerned neighborhood checkpoints. The fourth concerned ongoing construction and social distancing. The fifth concerned arena operatons. At the meeting, Barclays Center spokeswoman Mandy Gutmann responded to questions about the status of the elevator and escalator, often out of service , at the arena plaza. As shown in the photos below, for security purposes, police have limited access to the the transit entrance, but people can get there. "The elevator is currently operating, and according to availablity reports we receive from Schindler , the operator, it’s functioning 92% of time," Gutmann said. "There are short periods it goes down and has to be re-set... Our security has been consistently checking to ensure the...

Barclays Center says they've switched vendors to try to fix oft-faulty elevator at arena plaza

This is the second of four articles on the 3/3/20 Atlantic Yards/Pacific Park Quality of Life meeting , held by Empire State Development (ESD), the state authority overseeing/shepherding the project. The first concerned timing for the platform and other project elements.  The  third  concerned construction progress. The  fourth  concerned Barclays Center-related traffic issues. For several years, advocacy groups have pointed to the often out-of-service elevator at the Barclays Center plaza--which leads to Brooklyn's busiest subway complex--as a sign that privately-managed elevator offer subpar service. Elevator mezzanine level 3/5/20 At the meeting three nights ago, a representative of the arena said they had recently switched vendors. "So it's something that we are actively trying to fix," said Mandy Gutmann, Senior VP, Communications. "It requires a bit of an overhaul. And we are working to get full approval. To do that, we have to work for the city...

More details regarding that Downtown Brooklyn streetscape makeover, including a fanciful (?) image of a rising walkway (and limited skyline) at Barclays Center plaza

I wrote 12/20/19 about a new Downtown Brooklyn streetscapes plan, from the Downtown Brooklyn Partnership, which--according to a CityLab article--would deliver a multidirectional pedestrian crossing to the intersection of Atlantic and Flatbush avenues. I could get any more information on that, and it's absent from the official press release, dated 12/18/19  Downtown Brooklyn Partnership Unveils Sweeping Public Realm Vision to Pedestrianize Downtown Brooklyn . But it does have an intriguing, perhaps fanciful image (below) looking north on Flatbush Avenue from the Barclays Center plaza, just outside the subway entrance. What's this? First, it seems an elevated walkway, perhaps leading to a peak, or perhaps simply looping toward Atlantic Avenue, is planned. Second, the skyline is a little... empty. I think  the very narrow, wedge-shaped tower on the horizon is 300 Ashland, but I'm not sure.  Whether or not, the image does not come close to portraying...

A new Downtown Brooklyn streets plan would cut space for cars, improve pedestrian experience. No details (yet), but multidirectional pedestrian crossing proposed at Atlantic and Flatbush

Yesterday we learned, at least preliminarily, about the Downtown Brooklyn Public Realm Vision, aiming to improve the streetscapes. As CityLab's Benjamin Schneider reported yesterday,  Bjarke Ingels Group and WXY Reimagine Downtown Brooklyn . Of course, those design firms are working for the Downtown Brooklyn Partnership, described as "a consortium of three business improvement districts," but rather a group of real-estate owners and developers.  So, while the plan for "curtailing car access and installing protected bike lanes, colorful street furniture, and monumental gathering spaces" sounds impressive, let's give it an incomplete for now, until we see how all interests respond.  (While diverting eastbound buses on the Fulton Mall to Livingston Street makes sense in some way, how much adjustment would that be for shoppers?) An improved crossing at Atlantic and Flatbush At Atlantic and Flatbush From the article: The intimidating, comp...

Vanderbilt Yard delay well less than that of East Side Access, now due in 2023

Hey, remember East Side Access, Long Island Rail Road service to Grand Central Station in Midtown East (as opposed to Penn Station in Midtown West)? It was once supposed to begin in 2016, which meant that delays in the revamped Vanderbilt Yard, which would enhance shuttle service between Jamaica and Brooklyn, could have been problematic. The new Vanderbilt Yard has been delayed numerous times, but is now almost finished . Forest City Ratner in 2005 agreed to build a nine-track yard that can accommodate 76 train cars but, with the 2009  renegotiation , got the Metropolitan Transportation Authority (MTA) to agree to a seven-track yard holding 56 cars. East Side Access is even more delayed. As the Daily News reported 9/19/19, in  MTA seeks another $798 million to finish East Side Access project long plagued by delays and rising costs , the completion date is now projected as 2022, 13 years behind the original schedule, while the $11.1 billion estimated cost is $6.8 bil...

Consultant Stantec calls Atlantic Yards a "game changing" Transit-Oriented Development project (really?)

From Railway Age, 3/11/19, TOD: How New York got it right , by Stuart Lerner, Executive Vice President Infrastructure, Stantec (a design/engineering/consulting company): Transit-Oriented Development (TOD) has gained prominence in boardrooms around the country with the increasing urbanization of society. The TOD terminology used by real estate developers, transit agencies and political leaders is “development that focuses on dense, mixed-use communities, integrated into a neighborhood within a reasonable walk of high-order mass transit—generally high-frequency rail or bus lines.” It serves as a way of capturing the value of large mass transit earlier in a project’s life cycle, thereby increasing the sustainability of the TOD. This can be done by offering developers something they want—higher-density development, friendlier zoning laws or more retail—in exchange for sharing the cost of big-ticket items that benefit the entire community. The result is a walkable community that contrib...

Okay, that down Barclays escalator is still down (perpetually?). New deadline Jan. 9.

The down escalator at the Barclays Center was supposed to be up and running by Dec. 14, after an outage lasting about three weeks. Now that deadline is on its third extension . Though the photo shows that the deadline has been extended until Jan. 9, 2019, I don't think anyone should bet on that deadline.

OK, that Barclays escalator is down for another week

The down escalator was supposed to be up and running by Dec. 14, after an outage lasting about three weeks. That's been extended a week. Let's see if it actually gets back to service.

So, does increasing transit capacity foster gentrification?

Looming behind the 2003 Atlantic Yards proposal--and ever more present as the project has moved fitfully forward--is the question of gentrification: would the project further it, or help fight it? The answer, so far, is more of the former , though if built as proposed--with faster and more affordable below-market housing--that might be less pronounced. (To clarify, I'm referring to residential gentrification in the overall study area within a 3/4-mile radius, not the blocks immediately near the project, some of which have stagnant retail.) But it can't be teased out from everything else going on, notably the huge influx of market-rate units in Downtown Brooklyn, thanks to a rezoning, ostensibly to enable office space, that instead ushered in luxury towers. (The affordable units are significantly in a segment near the Brooklyn Academy of Music where city-owned sites lowered land costs and allowed the city to mandate some below-market units.) So that leads to another qu...

Next Atlantic Yards/Pacific Park Quality of Life meeting May 8: what about the escalators on the arena plaza?

The next opportunity for updates on Atlantic Yards/Pacific Park, and to ask questions of the developer and the state, is the bi-monthly Quality of Life Meeting, sponsored Empire State Development (ESD) and scheduled for Tuesday, May 8 at 6 pm: Shirley A. Chisholm State Office Building 55 Hanson Place 1st Floor Conference Room Interested parties can send project-related questions, concerns, or suggested agenda items for the meeting to atlanticyards@esd.ny.gov. There's no vertical construction ongoing or immediately planned. Here are a couple of issues I think we may hear about, beyond the requisite update on ongoing infrastructure, including the Vanderbilt Yard and, perhaps, temporary open space: progress on ensuring that the oculus on the Barclays Center plaza doesn't go off overnight . the condition of the escalator at the arena plaza How about those escalators? Regarding the latter, a resident recently alerted me with concerns the escalators emerging at the ...

Officials: Dean Street snags should be relieved, after construction coordination meeting (but what about arena ops?)

I'll have more reports from last night's meeting in a separate article. Will the scenario below on Dean Street between Flatbush and Sixth avenues, as detailed just last week, change? According to officials at a meeting last night, yes. But the proof will be in the pudding. Last night, at the bi-monthly Atlantic Yards/Pacific Park Quality of Life meeting (fka Community Update meeting fka Quality of Life Committee), Department of Transportation representative Abigail Ikner said that the multiple construction projects on Dean are "getting in each other's way." Do the DOT "had a construction coordination meeting Friday just to work out the amount of construction in that area," she said, indicating representatives of the 461 Dean modular building, part of Atlantic Yards/Pacific Park (on north side of the street), and the project involving the former Bergen Tile site (on the south side of the street). She didn't say anything, however, about are...

DOT floats plans to upgrade Atlantic/Flatbush area crossings; residents propose roundabout (and what about Site 5?)

Well, I missed the New York City Department of Transportation (DOT) workshop Wednesday on potential safety upgrades to the fraught intersection at and around Flatbush and Atlantic Avenues, but the Brooklyn Paper has published a report, Transportation buff: Replace treacherous Times Plaza with roundabout . Also the Brooklyn Paper linked to the Power Point presentation (bottom) by DOT, which proposes numerous tweaks (but no roundabout). Also, here's coverage from Streetsblog . Conspicuously missing, in my view, is any assessment of--and adjustment to--the potential impact of the huge two-tower project contemplated (but not yet approved) for Site 5, currently home to Modell's and P.C. Richard, across Flatbush Avenue from the Barclays Center. A roundabout? The lead of Dennis Lynch's Brooklyn Paper report: The city should fix the notoriously dangerous nexus at Flatbush, Atlantic, and Fourth avenues by turning the intersection into a roundabout, says a local transporta...