From the latest Construction Update: almost no change, except potential soil removal from southeast block sites
The latest Atlantic Yards/Pacific Park Construction Update (bottom), covering the two weeks beginning Monday, 9/7/20 (but presumably that's a day off), was circulated Friday, 9/4/20 at 4:08 pm (lead time) by Empire State Development (ESD) after preparation by Greenland Forest City Partners.
There's virtually no change from the previous update, including after-hours work at the B4 and B15 sites until 7 pm on weekdays and Saturday from 8 am to 5 pm.
At the B12/B13 sites on the southeast block, excavation and foundation work, including drilling of soldier piles (retaining wills) and installation of sheeting and lagging will continue.
As previously stated, a subcontractor may deliver oversized equipment (i.e. tooling, excavators, etc.) and soldier piles during early morning hours.
One slight change: soil removal, including trucking of excavated soil, and disposal may start.
There's virtually no change from the previous update, including after-hours work at the B4 and B15 sites until 7 pm on weekdays and Saturday from 8 am to 5 pm.
At the B12/B13 sites on the southeast block, excavation and foundation work, including drilling of soldier piles (retaining wills) and installation of sheeting and lagging will continue.
As previously stated, a subcontractor may deliver oversized equipment (i.e. tooling, excavators, etc.) and soldier piles during early morning hours.
One slight change: soil removal, including trucking of excavated soil, and disposal may start.