Starting overnight next Friday, June 3, through 9 pm on Sunday, June 5, the construction crane for 461 Dean Street, the B2 modular tower, will be dismantled, closing Dean Street between Flatbush and Sixth Avenues. (It's been there since November 2013.)
Sidewalks "will remain open only to residents and visitors of that block," which is pretty much everybody.
Notably, the B65 bus will be rerouted to St Marks Avenue and Carlton Avenue and vehicles needing access to the Barclays Center loading dock will go down Sixth Avenue, and turn right (normally against traffic on this typically one-way street), directed by flagmen.
Sidewalks "will remain open only to residents and visitors of that block," which is pretty much everybody.
Notably, the B65 bus will be rerouted to St Marks Avenue and Carlton Avenue and vehicles needing access to the Barclays Center loading dock will go down Sixth Avenue, and turn right (normally against traffic on this typically one-way street), directed by flagmen.
Comments
Post a Comment